What is the current machine performance? What's stopping us from improving performance or reducing downtime? With the machine dashboard, an instrument can be provided in the workshop for each system, making important figures related to the system transparent and at the same time creating an environment for communication between shifts. What happened during the current shift? What measures have been initiated or still need to be initiated?